Puzl CowOrKing Studio
- Year
- 2018–2025
- Location
- Sofia · Budapest · Bucharest
- Type
- Office
- Area
- >30 000 m²
- Office
- Puzl CowOrKing
- Client
- Puzl CowOrKing
- Tools
- Revit, AutoCAD, Enscape, Jira, Confluence
- Stages
- Feasibility · Concept · Permit · Technical · Tender · Site supervision · Quality control · Project management
Role & scope
I led Puzl’s in-house architecture and refurbishment studio, a team of more than 10 architects, designers and engineers, covering feasibility, concept, permit, technical design and tender through to site supervision, quality control and project management. I set up the standards, workflows and training that structured the team and built its expertise, and partnerships with architecture, engineering and construction practices across Central and Eastern Europe to support delivery abroad.
Site selection and concept design: international coworking hubs
I sourced and selected buildings abroad, including in Hungary and Romania, and developed a concept for each site. I surveyed existing conditions, produced 3D models, brought listed buildings into a site-wide BIM model and set the architectural, functional and technical principles that guided local design teams.
Project lead: Sofia sites
I led three to four successive coworking projects from concept to completion, each delivered in under six months. I briefed and coordinated the in-house team of architects, engineers and designers, and worked with clients, consultants, contractors and authorities. I kept every site to Puzl CowOrKing’s standards, managed budgets and programmes, and monitored quality through to handover, down to bespoke furniture and decorative elements aligned with the brand’s identity.
Revit standards
I established team-wide Revit standards for concept design, electrical, HVAC and structural packages, and bespoke furniture: shared templates, families and schedules, then a two-way Revit–SketchUp workflow for furniture design. They streamlined drawing production and coordination across disciplines, reduced errors on site and shortened delivery times.